Industrial strapping supplies from Byler Industrial Tool β€” Gastonia, NC

Gastonia NC Industrial Strapping

Strapping that holds up at every stage: handling, shipping, storage, and stacking.

Byler Industrial Tool produces industrial strapping in metal and steel, polyester, nylon, polypropylene, and cord for Gastonia, NC woodworking and metalworking businesses β€” to secure loads through handling, shipping, storage, and stacking.

Free shop audit & cost savings analysis Β· Call (615) 763-6227 to choose your strapping

  • 456 miles from Erin β€” ~9 hrs drive
  • 5 strapping materials β€” metal and steel, polyester, nylon, polypropylene, cord
  • 4 stages covered β€” handling, shipping, storage, stacking
  • Industry-leading equipment β€” produces strapping for the full range
  • Freud Certified team β€” same standard on every product line

Serving Gastonia, NC woodworking and metalworking businesses from Erin, Tennessee.

Or call (615) 763-6227

5 Strapping Materials Available
4 Stages Covered β€” Handling to Stacking
100% Satisfaction Guarantee
Serving Gastonia

Industrial Strapping for Gastonia, NC

Distance and transit

Gastonia, NC is 456 miles (~9 hrs by road) from Byler's Erin, Tennessee facility, where Byler produces its industrial strapping. Call (615) 763-6227 to talk through materials, loads, and the stage of handling, shipping, storage, or stacking you need to cover.

Industrial areas and major plants around Gastonia

  • Gastonia Technology Park β€” 422-acre Gaston County-developed NC Certified Site zoned I-2 with a 50,000 kW substation; four foreign firms located there; Dymax Corporation (light-cure adhesives) announced a $21.5M, 59-job plant on Chief Court in 2020
  • SouthRidge Business Park β€” 425-acre master-planned county park for distribution and manufacturing, about 1 mile north of I-85; tenants listed by the county are Hunter Douglas, Dole Fresh Vegetables and Advanced Drainage Systems
  • Gateway85 β€” NorthPoint Development industrial park on I-85 between Gastonia and Lowell; tenants reported include Amazon, the U.S. Postal Service and Newell Brands (acreage reported inconsistently across sources, so omitted)
  • The Oaks Commerce Center β€” Privately owned 280-acre park listed by the Gaston County EDC; tenants include Cross Automation, Wilbert Plastics, Dixie Industrial Supply, Carus Phosphates and DePalo Bakery

The local industry

Manufacturing is Gaston County's largest industry at nearly 16,000 jobs, about 20% of the workforce (down from about 25,000 in 2000), per NC Commerce data cited by the Gaston EDC (2025)

Hans Kissle Company (fresh prepared foods) announced a $42.2M facility in Gastonia's Apple Creek Corporate Center adding 219 jobs (2022)

Dymax (light-cure adhesives and equipment) announced 59 jobs at a new Gastonia plant; KNOLL America (conveyor and filtration systems) built a U.S. headquarters and production facility at Apple Creek (2020)

Shipping and storage operations are one of the four stages (handling, shipping, storage, stacking) Byler's industrial strapping covers.

Industrial Strapping Pricing

Byler quotes this service on request. Use the form above or call (615) 763-6227.

  • Free shop audit & cost savings analysis for production shops
Request a Quote

Gastonia businesses: talk to Byler about the right strapping option. Request a quote today.

Request a Quote
Gastonia Shops Ask

Industrial Strapping in Gastonia, NC β€” Local Questions

How far is Gastonia, NC from Byler, and how do I order strapping?

Gastonia, NC is 456 miles (~9 hrs by road) from Byler's Erin, Tennessee facility. Call (615) 763-6227 to discuss the strapping option that fits your materials, loads, and process.

Can businesses at Gastonia Technology Park order strapping from Byler?

Call (615) 763-6227 and describe your materials and loads. Byler produces metal and steel, polyester, nylon, polypropylene, and cord strapping for handling, shipping, storage, and stacking.

How does industrial strapping fit the industries around Gastonia, NC?

Manufacturing is Gaston County's largest industry at nearly 16,000 jobs, about 20% of the workforce (down from about 25,000 in 2000), per NC Commerce data cited by the Gaston EDC (2025). Shipping and storage operations are one of the four stages (handling, shipping, storage, stacking) Byler's industrial strapping covers.

Byler Industrial Tool Guarantee

Every blade, bit, and knife Byler sharpens ships with a 100% satisfaction guarantee. If your tooling does not perform to specification after reconditioning, Byler resolves the issue β€” no debate, no delay. That guarantee applies to every job, every brand, and every customer regardless of location.

Cities We Serve β€” Industrial Strapping

Gastonia Businesses:
Strapping That Holds. From Handling to Stacking.